Survey & Setting Out

Survey & Setting Out

Setting out reference points for cross passage location on the tunnel segments as per the drawings. For setting out survey point total station will be used.

2
Probe Hole Drilling

Probe Hole Drilling

The location of the Probe Holes will be decided by the Tunnel-Engineer/or Geotechnical Expert. In general, these test holes will be drilled in The

3
Grouting

Grouting

Chemical grouting will be used in grouting which comprises of Sodium Silicate and Cement. The grouting criteria are based on the in-site soil conditions and are

4
Grouting - Drilling Pattern for Ground Consolidation

Grouting - Drilling Pattern for Ground Consolidation

Marking of grouting pattern points as per the sketch shown below

5
Forepoling

Forepoling

Prior removing the centre piece of the entry segment and starting the excavation work, a Segment support will be installed.

6
Segment core cutting for Door Frame Installation

Segment core cutting for Door Frame Installation

After Completion of Cross Passage Fore poling Support i.e., structural steel ring supporting frame.

7
Core Cutting and Segment Removing

Core Cutting and Segment Removing

After installation of top and bottom lintels or Temporary ring, we can start to remove the centre segment part to allow entry for the cross passage works.

8
Excavation Sequence

Excavation Sequence

The excavation of the cross passages will be carried out wherever it is possible with small  excavators, rock breakers like Tata Hitachi TMX-20 & Hilti 1000AVR.

9
Muck Removing By Mini Dumper

Muck Removing By Mini Dumper

From the face, the muck shall be loaded by TMX-20 and transported into a muck dumper (407 Tipper) stationed inside the tunnel.

Untitled-1
Lattice Girder Heading

Lattice Girder Heading

Immediately after excavation, Primary lining with sprayed concrete will be applied. The Primary lining and other details shall be followed as per approved drawing.

10
Wire Mesh Fixing

Wire Mesh Fixing

After completion of first layer of shotcrete, wire mesh shall be installed. To support this wire mesh, nails shall be placed on first layer of shotcrete.

11
Shotcreting

Shotcreting

Shotcrete shall be used as per approved drawing. The shotcrete mix ratio shall be followed as per approved mix design.